Sep 14 2007
Progress

The bathroom project is nearing its final stage. The client is enjoying his daily showers and baths and I just have to do the finishing touches. Unfortunately a lot of finishing touches, because I almost changed the whole house to make this bathroom. I moved two doors and two walls and so there is a lot to plaster, a couple of doors and their mouldings and thresholds need to be re-installed and a lot of other small things need to be done as well. So I won’t be finished in a week or so, and after that I still have to built some custom furniture (a vanity, mirror cabinet and doors and drawers above the washer/dryer combination) to complete the project. But it looks pretty nice and the client is very happy. It even sounds nice because I installed speakers above the bath tub and while I work I now listen to music in genuine bathroom acoustics.

Monday, 24 September, 2007 @ 08:33
That looks sharp. The three different types of tile/stone looks pretty interesting.
Friday, 18 July, 2008 @ 17:26
Where do get those tiles on the floor? I love them.
Friday, 18 July, 2008 @ 19:55
The tiles are slate and are not that hard to get. I’ve found two places in Montréal that carried them.